February  2013  – June 2013
On The Power Study for “UNIFORM” Flow Station on the cooperation project between PT. Pertamina Hulu Energi (PHE ONWJ) and PT. LAPI ITB.

February  2013  – June 2013
Technical Assessment of Structure Condition and Performance Operation of the Container Crane (CC-04) Mitshui Paceco on Belawan International Container Terminal for the cooperation project between PT. Pelabuhan Indonesia I (Persero) and LAPI ITB.

June 2012 – December 2012
Compressor Train & Intercoolers Performance Evaluation for PT. Sulzer Turbo Services Indonesia

July 2010 – July 2012
Technical Assistance and Supervision for Manufacturing 3 Units Container Crans and 10 units Rubber Tyred Gantry Cranes for Belawan International Container Terminal, PT. Pelabuhan Indonesia I, Medan.

May 2011 - June 2011
Investigation of Unit-1 and Unit-2 Trouble of Cikalong Hydro Powerplant.
It is performed between PT. MEMETRI and PT. METRAKON for PT. Indonesia Power UBP Saguling.

June 2010  – October 2011
Assessment of Struture and Operational of 5 Unit Container Cranes and 10 Units Rubber Tyred Gantry Cranes on Belawan International Container Terminal, PT. Pelabuhan Indonesia I, Medan.
It is performed between LAPI ITB and PT. METRAKON.

June 2010 – December 2010
FMEA analysis for mechanical and electrical & control equipments in the 2x100 MW steam power plant on the “PLTU Tarahan FMEA Analysis”, the cooperation project between PT. Adikari Wisesa Indonesia and PT. PLN

June 2009 – December 2009
50 lt/s Water Treatment Plant Simulation & Optimization using CFD Software Simulator, the cooperation project with Departemen Pekerjaan Umum Cipta Karya.

May 2009 – October 2009
Kaolin Dryer Optimization using CFD Software Simulator, the cooperation project with PT. Rekadaya Teknik Mandiri.

January 2009 – July 2009

Cooling system , hydraulic flow calculation, include pump and compressor calculation on the “Study of H2S Stripper” , the cooperation project between Citic Seram Energy Limited and LAPI-ITB.

July 2008  – December 2008
Technical Audit of 180MW – Jatiluhur Hydro PowerplantPurwakarta -  Jawa Barat.
It is performed between PT. MirantiKonsultanPermai and PT. METRAKON for Perum Jasa Tirta II (PJT-II).

July 2006 – January 2007
The Optimization Study of Energy-Primer Utilization for Electric Power-Generating Plant.
Collaborating with The Foundation for Research & Industrial Affiliation, Bandung Institute of Technology (PT LAPI ITB) for Directorate General of Electricity and Energy Utilization (DJLPE) of Indonesia.

June 2006 – December 2006
Calculate heat & mass balance for the cogeneration power plant and major equipment selection on the “Feasibility Study of Combined Heat & Power Plant”, the cooperation project between KPA (Kaltim Pasifik Amoniak) and PT. LAPI-ITB.

June 2005 – December 2005
Pump design & simulation using FLUENT software on the “Study of SUMP G-34-106B Pump Modification”, the cooperation project between PT. Pertamina UP V Balikpapan and LAPI-ITB.

March 2005 – April 2006
Study for Retrofit on Power and Control System at Automatic Handling of Container-Crane (CC-02) at Belawan International Container Terminal, PT. Pelabuhan Indonesia I, Medan.
Collaborating with PT Perfecta Sarana Engineering to support with specialization in technical investigation and supervisory of development.

December 2004 – June 2005
Power System Standardization and Solution for PT. Telkomsel Indonesia.
Collaborating with Electrical Engineering Department – Bandung Institute of Technology (ITB) to support in technical fields.

January 2004 – November 2004
Study for Trouble shooting and Performance Forecast in Factory Process at PT HEBEL Indonesia.

November 2003 – July 2004
Audit of Technical Performance of Jatiluhur Hydro-Power Plant, Perum Otorita Jatiluhur.
Collaborating with IlyaAvianti& Partner Registered Public Accountant Firm to support in technical fields.

October 2002 – December  2002
Feasibility Testing of Container Handling System at Belawan Internation Container Terminal, PT. Pelabuhan Indonesia I, Medan.
Collaborating with Superintending Company of Indonesia (SUCOFINDO) to support with specialization in Instrumentation and Electrical System.

September 1999 – January 2000
Y2K Comply Checking for Factory Automation Process – Facilities at PT HEBEL Indonesia.
Collaborating with The Electric Energy Conversion Research Laboratory – Bandung Institute of Technology (LPKEE ITB) to support in fields.

September 1999 – March  2000
The Study for standardization on Lightning Protection Systems of Station Television and Radio Transmitter – State Radio and Television Company Indonesia (TVRI/RRI).
Collaborating with The Institute of Public Service – Bandung Institute of Technology (LPM-ITB) to support in technical fields for Information Department of The Republic of Indonesia. 

August 1997 – December 1997
The Study of Electrical Power Quality at RISTI Building – PT TELKOM, Indonesia.
Collaborating with The Institute of Public Service – Bandung Institute of Technology (LPM-ITB) to support in technical fields.

October 1995 – November 1996
The Study of Electric Network Development Planning in Tangerang Area – State Electricity Company of Indonesia (PT PLN).
Collaborating with The Institute of Public Service – Bandung Institute of Technology (LPM-ITB) to support in technical fields.